Number of silo cells: | 1 - 4 pieces | |
Discharge type: | bulk ventilation blower 2.2-3.0 kW | |
Transport blower: | 3,0 - 18,5 kW | |
Pipe screening machine: | included or excluded | |
screening machine: | included or excluded | |
Pipe switch: | 0 - 6 pieces | |
Weighing station 1: | Sewa 60 - 100, BWI with vibrators, jet filter | |
Weighing station 2: | excluded or same as weighing station 1 | |
Full indicator control: | internal or external | |
Kneader extraction: | included or excluded | |
Knead points: | 1 - 2 pieces | |
Collapsible boxes: | included or excluded | |
Fine dosing: | included or excluded | |
Long ventilation: | included or excluded | |
Power supply: | 400 volt |
Standardized switchboard for electrical load control of attached silo units of simple specification according to the selection above. Note: Earthing of the overall unit is important! Installation of the switchboard outside of the silo space.
The standardized switchboard controls silo units and is equipped with protection switches, protection, timing relays, main safety switch, transformers and clamps. All functional parts are wired and interlocked; all cables and clamps are labelled.
The switchboard is made of lacquered sheet steel. When aopening the switchboard door, the power will be shut off automatically. The applicablsafety guidelines of corres- ponding country norms are complied with. There is a switch plan in the switchboard.