Individually laid silo filling pipeline TWV

Description

Basic technical information

Pipeline diameter:    60, 90 or 108 mm
Pipeline material: aluminium, stainless steel or
lacquered steel
Filling position: from the front side, from above
or special position
Coupling type: country-specific or excluded
Filter surface connection: standard with pie connection
from above, pipe connection laterally
or excluded
Country specification: coupling type according to country
Coupling lock: included or excluded
Coupling end switch: excluded or connected with full signal
Full signal control: in the switch cabinet,
external full signal box or none
TW pre-sieve:in-line sieve or excluded
TW overfill protection:included or excluded
Explosion protection facility: spark detector with flap or excluded
Pipeline earthing: on site
Total pipelength
(TWK-silo):
0 – 300 lfm
Pipe bend 90°:0 – 30 units
Pipe bend 45°:0 – 30 units
Pipe bend 30°: 0 – 30 units
Pipe sleeves: according to calculation
Hiti clamping bracket: according to calculation
Silo mounting elbow: according to calculation

Intended use
Pipeline and technical accessories for the silo filling from the tank lorry.
Indication:
Customer consultation and precise technical aspects of the spatial situation necessary!
Stainless steel is required for abrasive conveying materials such as sugar!

General function
The tank lorry filling pipelines are individually laid from silo up to the coupling spot.
The silos can therefore be individually filled from an external spot (tank lorry control cabinet).
Indication:
The full signal facility must be installed externally – either integrated in the tank lorry control cabinet or as external full signal box.

Construction
Pipes and bends are in aluminium (food safe) or finished as per demand in stainless steel or lacquered steel.


Symbol pictures – technical modifications reserved!

Downloads

Downloads

Up-to-date

We are always present on exhibitions and arrange seminars for our customers and interested persons. Here you get information about seminars and workshops!

Installation examples

Some of our approx. 4000 worldwide built plants, we present to you in detail as orientation and planning help for your needs.
To Installation examples

We are always there for you!

... whenever you need us! With worldwide more than 15 representatives and agents.